SOLUTIONS

Review the site conditions before defining control, signal and power.

Share the venue dimensions, existing fixtures, wiring and operating needs. Baihe will identify what may stay, what needs to be added and how the system can be connected.

Home
Baihe lighting application scene for Review the site conditions before defining control, signal and power.
PRODUCTS · APPLICATIONS · PROJECT PATHSUse these pages for initial assessment; final configurations are confirmed by project.
Wireless access for distributed lights | BHC5 application scene
01

Wireless access for distributed lights | BHC5

At suitable sites, distributed centerpieces, prop lights and low-voltage sources can connect to phones, tablets, wall panels or professional controllers with fewer long signal runs. Coverage and control interfaces are confirmed by project.

Power distribution and circuit management | Smart cabinet application scene
02

Power distribution and circuit management | Smart cabinet

Factory-prewired distribution, protection and control can reduce field electrical work and temporary changes. Circuit configuration follows the load and project requirements.

Network and signal distribution for multiple zones | AN800 application scene
03

Network and signal distribution for multiple zones | AN800

Standard network cable and pinouts on a separately planned control network can distribute Art-Net / DMX to rooms, zones and remote decoder nodes.

Scene recall from phones, tablets and wall panels | BH-101 application scene
04

Scene recall from phones, tablets and wall panels | BH-101

Lighting scenes, timelines, control interfaces and field devices can be coordinated by project, with the related configuration and handover records retained.

TECHNOLOGY PREVIEW / ROADMAP

We are validating technical approaches that can reduce cabling and simplify commissioning.

The directions below are under solution validation or project adaptation. They are not standard features for every project; Baihe will state what is ready and what still requires validation.

01 / PLC

Use suitable power lines as the lighting-network backbone

For fixed and widely distributed fixtures, we are validating control-data transport over suitable power wiring to reduce added signal cabling.

UNDER VALIDATION
02 / NEARLINK · 星闪

For nearby setup, diagnostics and backup access

NearLink work focuses on discovery, local setup, diagnostics and backup access, while BHC5 and established professional links remain responsible for live control.

TECHNOLOGY PREVIEW